- Case Study
- Qdos 60 ReNu PU pumphead runs for three years without maintenance
- Qdos chemical dosing pump eliminates risk of polymer leaks at Tennessee water treatment plant
- Qdos dosing pump provides consistent and accurate feed rate of the coagulant
Prototype operates without leaks and maintenance downtime
A Qdos 60 PU peristaltic pump has completed three years of maintenance-free operation without any messy leaks of polymer in a trial at the City of Oak Ridge water treatment plant in Tennessee, United States.
In a trial that began in May 2020, the prototype Qdos 60 PU peristaltic pump with ReNu PU pumphead is dosing polyaluminium chloride, a polymer used in water purification which enhances flocculation and coagulation of pollutants.
In his role as plant manager at the City of Oak Ridge water treatment plant in Tennessee, Mark Terry did not have to stop production for maintenance downtime or deal with a polymer leak—which are expensive and time-consuming to clean up—from the pump in over three years of using Qdos 60 PU.
“We’ve experienced no polymer leaks and, aside from occasional calibrations, the pump has maintained a very consistent and accurate feed rate of the coagulant”.
The Qdos 60 ReNu PU pumphead, designed for polymer dosing, has performed without replacement and provided efficient, safe, leak-fee and reliable polymer metering.
“The Qdos 60 pump that is used to feed coagulant—a polyaluminium chloride polymer called DYPAC 5461—and the prototype pump head that we were given to try out from Watson-Marlow has been absolutely amazing,” said Terry.
“The pumps that we previously used to add coagulant into our facility’s raw water were quite old and, from time to time, were prone to clogging. We decided to use a Qdos 60 PU pump based upon the specifications provided for the pumps and, to this point, we have not been disappointed with the performance.
“The Qdos 60 and ReNu PU pumphead was installed and began feeding the coagulant using on May 14, 2020. Other than when the facility has been shut down for a few hours due to temporary power outages for example, the Qdos 60 pump and the prototype pumphead has run almost non-stop for three years.”
Eliminates polymer leaks
The Qdos 60 PU offers precise and repeatable flows for many hard-to-handle fluids, including viscous fluids and aliphatic hydrocarbons, at linear flow rates of up to 60 L/h (15.8 GPH) and pressures of up to 5 bar (73 psi). The ReNu pumphead is a single, safely contained component for rapid no-tools maintenance with no additional valves to fail, or vapour lock.
“The two most obvious benefits that the Qdos pump has provided to my water treatment plant is that we’ve basically experienced no polymer leaks and, aside from occasional calibrations, the pump has maintained a very consistent and accurate feed rate of the coagulant that we add to our raw water,” Terry said.
“Low maintenance and non-stop running of the Qdos pump at our facility is vitally important because our plant, aside from a few unplanned episodes, runs 24 hours a day, seven-days-a-week. Based upon these realities the Qdos pump has been a great choice for the needed application.”
Benefits of the Qdos 60 PU include:
- Excellent compatibility for complex polymers including polyacrylamide (PAM) and other flocculants and coagulants used in wastewater treatment
- The contained pumphead design with integral leak detection reduces wastage and eliminates operator exposure to chemicals
- Precision dosing of ±1%, even under varying conditions, minimises chemical expenditure
- Low- shear, gentle peristaltic pumping protects polymer chains and consistency, maintaining product integrity
Handles corrosive chemicals
Oak Ridge water treatment plant is using seven Qdos peristaltic pumps (both 30 and 60 models) to feed chemicals such as 20% sodium permanganate, 12.5% sodium hypochlorite, fluorosilicic acid and a poly/orthophosphate corrosion inhibitor to the plant’s current coagulant.
“The Qdos 30 pump that is used to feed fluorosilicic acid at the water treatment plant has performed admirably considering the pressure it works against and because of the corrosive nature of the chemical, like the hypochlorite feeding Qdos 60 pumps,” Terry added.
Oak Ridge is also replacing the existing 1943 plant that provides the city’s drinking water with a new facility to treat over 45 million litres (12 million gallons) of water per day and provide water to 31,000 residents. The new plant will be ready to provide water by spring 2025 and will be using ten Qdos 60 pumps for a variety of chemicals for water treatment such as hydrogen peroxide, sodium permanganate, and fluoride. In addition, WMFTS will also be providing two Bredel Apex 15 pumps for sodium hypochlorite.
Chris Miller, District Sales Manager at Watson-Marlow, said: “Oak Ridge was having problems with their older diaphragm pumps so I suggested a trial on our Qdos 60 PU. It’s been one of our great success stories and in working with the engineer and city, we are excited to see that Qdos will be the chemical feed pump of choice for the new water plant.”
Solutions for you
To learn more about our solutions for your applications please